Verifying the SAN Volume Controller installation
After you have installed the SAN Volume Controller into
the rack and connected it to both the uninterruptible power supply and the
SAN, this task provides the steps you complete to verify the installation.
Prerequisites
Check the configuration data table provided by the customer the speed at
which the SAN Volume Controller nodes are to be operated (usually 2 Gbps).
Steps
Perform the following steps to verify the installation of
the SAN Volume Controller.
- Press the SAN Volume Controller power switch. Verify that the green power light is on.
If the light is not on go to MAP 5000: Start to repair the problem.
 | Note: You do not need to install any software. The node boots automatically. |
Verify that the node is booting without error:
- If it boots without error, the Charging message is displayed
in line 1 of the front panel display. A progress bar is displayed in line
2 of the front panel display. Battery charging can take up to 3 hours until
the battery is fully charged. When the battery is charged enough, Cluster: is displayed in line 1 of the front panel display; line 2 is blank.
- Press and hold the select button for five seconds. The check light comes
on and a display test is performed. When the display test is complete the
check light goes off and a button test is started.
- Press the up, down, left, and right buttons to verify that they
are working. See Figure 57, which shows four examples of what
the front panel should display when you press the buttons. When you have finished
testing the buttons, press and hold the select button for five seconds to
exit the test.
Figure 57. Front panel display when push buttons pressed
- If the Charging message is displayed on the front panel display,
press the select button to switch to the menu. The menu continues to be displayed
while you press the buttons on the front panel. If you do not press any buttons
within 60 seconds, the menu changes to display the charging progress. You
can switch the front panel display to the menu at any time by pressing the
select button again.
- Keep pressing and releasing the up or down button until the Node: option is displayed in line 1 of the front panel display.
- Verify that the node number that is displayed in line 2 of the display
is the same as the node number that is printed on the front panel of the node
(see Figure 58).
The XXXXXX in Figure 58 represents
the node number. If the numbers do not match, exchange the Front Panel
FRU on the SAN Volume Controller.
- Keep pressing and releasing the up or down button until the Ethernet option is shown on the front panel display. Line 2 of the front panel
display shows the message Inactive. This message shows that, although
an Ethernet connection is available, it cannot yet be used (see Figure 59).
- Keep pressing and releasing the up or down button until the FC Port-1 option shows in the display.
- Check whether line 2 of the display shows the message Active.
- Keep pressing and releasing the left or right
button to display the other port options. Check whether for each port, line
2 of the display shows the message Active. If Active is
not shown for any port, go to MAP 5600: Fibre-channel to repair the fault.
- If the configuration data table provided by the customer indicates that
the SAN Volume Controller nodes are to be operated at 1 Gbps, press and hold the down button;
press and release the select button. Release the down button. The second line
of the display will show the current fibre channel speed setting of the node.
Press the up or down button until 1 Gbps is displayed and then press the select
button. This changes the fibre channel speed for all ports on this node to
1 Gbps.
-
If you want to select a language other than English,
perform the following steps:
- Press the up or down button until Select Language? displays.
- Press the select button.
- Press the left or right button until the required language is displayed.
- Press the select button.
- Repeat steps 1 through 12 for each SAN Volume Controller.
- When the battery is fully charged, the charge progress bar is replaced
by the Cluster option on the front panel display of the SAN Volume Controller.
You have completed the hardware installation
for the SAN Volume Controller. The customer can now begin to create clusters and perform other
configuration tasks. See the IBM TotalStorage SAN Volume Controller: Configuration Guide for detailed configuration
instructions.