This topic provides the charts and tables that you need to complete before the service representative installs the SAN Volume Controller, uninterruptible power supply unit, and master console.
Before the service representative can start to install the hardware, you must plan the physical configuration of the system. You must also plan the initial settings that the service representative and you need to complete the initial setup of the SAN Volume Controller, uninterruptible power supply unit, and the master console.
Before you complete the following tasks, make a copy of the blank charts and tables so that you always have the blank originals if you want to reconfigure your system in the future.
When you have completed these tasks you are ready to perform the physical installation.