This task describes how to install the support rails for the uninterruptible power supply.
Perform the following steps to install the support rails for the uninterruptible power supply:
| Note: If you are installing the SAN Volume Controller into a rack that already contains other SAN Volume Controllers and uninterruptible power supplies, the installed uninterruptible power supplies might have spare capacity. If the customer intends to use that spare capacity, the SAN Volume Controllers that you are going to install might have been delivered without uninterruptible power supplies. |
| Note: The bottom of the flange of the support rail must align with the EIA mark on the rack. |

| Note: Hold the support rail in position until you have completed step 4h. |