Installation planning Preparing your svc environment Planning guidelines for using your svc in a SAN environment

Before the service representative can start to set up your SAN Volume Controller, you will want to verify that the prerequisite conditions for the SAN Volume Controller and uninterruptible power supply installation are met. The following checklist will help to ensure that all minimum requirements for installation are met.

  1. Does your physical site meet the environment requirements for your SAN Volume Controller, master console, and uninterruptible power supply?
  2. Do you have adequate rack space for your hardware?
    • SAN Volume Controller: 1 Electrical Industries Association (EIA) unit high for each node.
    • Uninterruptible power supply: 2 EIA units high for each uninterruptible power supply.
    • Master console: 2 EIA units high.
  3. Do you have power distribution units in the rack to provide power to the uninterruptible power supply units?

    A clearly visible and accessible emergency power off switch is required.

  4. Ensure that you provide appropriate connectivity.
Related topics Preparing your svc environment Planning guidelines for using your svc in a SAN environment

(C) Copyright International Business Machines Corporation 2003, 2004