Internal machine checks Inspecting the svc for unsafe conditions Checking the grounding of the svc and the uninterruptible power supply

This topic describes the checks that you should perform on the inside of the SAN Volume Controller.

Steps

Perform the following internal machine checks before you install the SAN Volume Controller:

  1. Check for any non-IBM changes that might have been made to the machine. If any are present, obtain the "Non-IBM Alteration Attachment Survey" form number R009, from the IBM branch office. Complete the form and return it to the branch office.
  2. Check the condition of the inside of the machine for any metal or other contaminants, or any indications of water, other fluid, fire, or smoke damage.
  3. Check for any obvious mechanical problems, such as loose components.
  4. Check any exposed cables and connectors for wear, cracks, or pinching.
Related topics Inspecting the svc for unsafe conditions Checking the grounding of the svc and the uninterruptible power supply

(C) Copyright International Business Machines Corporation 2003, 2004